Skip to contentRecent changes
RSS
- Cultural venue at Calle Arturo Toscanini New Finished
- 135 homes at El Higueral New In process
- Sports facility, refurbishment, at El Palo New Finished
- Sports facility, refurbishment, at La Unidad New Finished
- 1 home (location not published) New No news since November 2024
- Office building at Málaga TechPark New No news since December 2024
- 35 homes (location not published) Under construction
- Public building at Avenida Pio Baroja New Finished
- Urbanisation at Calle Jimenez Fraud New No news since February 2024
- Retail building (location not published) New No news since November 2023
- Public building, refurbishment, at Calle Charles Dickens 6 8 Finished
- Public building, refurbishment, at Calle Charles Dickens 6 8 Investment: 1339481
- Retail building at Avenida Enrique Granados 2 New In process
- 21 homes at Calle Jose Trigueros 9 New In process
- Sports facility at Calle Demostenes 13 New No news since December 2024
- Sports facility at Calle Linguista Manuel Seco 16 Finished
- Sports facility at Calle Linguista Manuel Seco 16 Investment: 744000
- Sports facility at Calle Linguista Manuel Seco 16 New Finished
- Cultural venue at Calle Muro de las Catalinas 10 New Finished
- Vega Campanillas · new urban development (7,339 homes) New In process
- Tennis and padel centre · El Pato (municipal plots concession) New Starting soon
- Mercado de Teatinos · new municipal market (40-year concession) New Starting soon
- Cementerio Histórico de San Miguel · repaving, lighting and drainage (phase 1) Tender: 2630701
- Cementerio Histórico de San Miguel · repaving, lighting and drainage (phase 1) Investment: 2564745
- Cementerio Histórico de San Miguel · repaving, lighting and drainage (phase 1) Planned start: 2026-07-31
- Mercado de Salamanca surroundings · renaturalisation New Announced, not confirmed
- Proton therapy centre · Hospital Regional (Materno Infantil site) New Under construction
- Plan Joven · 599 affordable rental homes on five municipal plots (GENIVS) New Starting soon
- Calle Ollerías · full street regeneration Tender: 2274234
- Málaga Philharmonic new home · El Ejido pavilion, phase 3 New Starting soon
- Museo Alborán · Mediterranean biodiversity centre (Palmeral de las Sorpresas) New Under construction
- Calle Massenet 17 · 84 affordable rental homes by Parque de las Virreinas New In process
- EMASA network renewal · Las Flores New Under construction
- Las Flores · urban regeneration, phase 1 (ramps and safer walking routes) New Starting soon
- Calle Lagunillas, Plaza de la Victoria side and Plaza Miguel de los Reyes · renewal phase 2 New Under construction
- New secondary school (IES) in Soliva · 640 places New Starting soon
- Old Hospital Pascual · reopening as a public outpatient centre New Under construction
- EMASA · reclaimed-water network from the Guadalhorce treatment plant New Under construction
- Bypass Gibralfaro · footpath on the lower slope of Gibralfaro New In process
- García Grana (4 de Diciembre) · social infrastructure regeneration New Approved
- Junta offices on Avenida de la Aurora ('Edificio Negro') · full refurbishment, design New In process
- Cruz del Humilladero · urban renewal around Calle Teba and Pasaje Eguiluz New Announced, not confirmed
- Port · cruise Terminal B energy retrofit New Announced, not confirmed
- Calle Cobertizo del Conde · street renewal New Starting soon
- Calle Cerrojo · 50 protected homes for sale (AVRA) New Starting soon
- Málaga Cathedral (La Manquita) · new roof and rainwater system New Under construction
- Palacio de Deportes Martín Carpena · new stands (11,000 seats) New Starting soon
- Alameda de Capuchinos 29 · study room and adult-education centre New Starting soon
- Detailed study (Estudio de detalle) at Camino Suarez 23 Homes: 6
- Other planning notice: Inicitativa privada y Sometimiento a Consulta Pública del Avance de Un estudio de ordenación en el ámbito del Arroyo Pilones In process
- Public tender: Obras del proyecto de demolición de varios edificios en avenida Pintor Sorolla 58 a 68 New Starting soon
- Public tender: Obras relativas a las actuaciones en cubiertas del edificio para la rehabilitación y adaptación del antiguo Hospital Noble, sito en Plaza del general Torrijos, 1 Málaga New Starting soon
- Student residence (location not published) New No news since December 2021
- 444 homes at Nereo Developer: Bacardi España S.A.
- 444 homes at Nereo No news since October 2021
- 444 homes at Nereo Homes: 444
- 444 homes at Nereo Developer: Comisión Gestora del sector Nereo
- 93 homes at El Cañaveral Developer: Qabit Peñalara S.L.
- 93 homes at El Cañaveral Homes: 93
- 870 homes at La Térmica No news since March 2024
- 2,847 homes at Rojas-Santa Tecla No news since October 2020
- Homes, change of use, at Camino San Rafael Homes: not stated
- 1,250 homes at Cortijo Merino New No news since May 2020
- 168 homes at Cortijo Merino Developer: Premier Tilos S.L.
- 168 homes at Cortijo Merino Homes: 168
- 168 homes at Cortijo Merino Investment: not stated
- 168 homes at Cortijo Merino New No news since September 2023
- 114 homes at El Pato Licence granted · start not confirmed
- 114 homes at El Pato New Licence granted · start not confirmed
- 93 homes at Hacienda Segovia No news since May 2020
- 93 homes at Hacienda Segovia Developer: Sabadell Real Estate Development S.L.
- Homes at Los Guindos 1 No news since April 2020
- Homes at Los Guindos 1 Homes: not stated
- 5 homes at Calle Haiti New Under construction
- 140 homes at Sánchez Blanca New Under construction
- Public building at Calle Frank Capra New Under construction
- Cultural venue at Plaza de Manuel Azaña Licence granted · start not confirmed
- Retail building at Tejar de Salyt New Approved
- 296 homes at Churriana New In process
- Public building, refurbishment, at Centro Histórico New Under construction
- 172 homes (location not published) Licence granted · start not confirmed
- 172 homes (location not published) New Licence granted · start not confirmed
- 62 homes at Calle Tanzania Licence granted · start not confirmed
- 73 homes at El Cuartón New Finished
- Sports facility, extension, at Parque Arraijanal Licence granted · start not confirmed
- 35 homes (location not published) New Under construction
- Mixed-use building at Huertecilla Tarajal New No news since June 2024
- Sports facility at San Julián New No news since January 2024
- School at Calle Navarro Ledesma New No news since December 2023
- Reparcelling or urbanisation: Establecimiento del sistema de actuación Marqués de Paniega New In process
- Reparcelling or urbanisation: Proyecto de expropiación de terrenos incluidos en el SG-LE.4 Necesarios para la ejecución del Bypass Gibralfaro New In process
- Reparcelling or urbanisation: Proyecto de reparcelación sector PA-PD.9(T) Morales New In process
- Other planning notice: Documento Denominado Actualización de la Zonificación Acústica de la Ciudad de Málaga In process
- Reparcelling or urbanisation: Proyecto de expropiación de terrenos incluidos en la finca 4 del Cañada de los Ingleses New In process
- Reparcelling or urbanisation: Proyecto de expropiación de terrenos incluidos en el Mercado de Abastos New In process
- Reparcelling or urbanisation: Proyecto de expropiación SG-LO.2 Avenida Manuel Alvar-Camino de la Térmica New In process
- Public building at Carretera Olias 72 New Finished
- 18 homes at Calle Max Bruch 6 Licence granted · start not confirmed
- Public building, refurbishment, at Calle Charles Dickens 6 8 No news since August 2025
- Public building, refurbishment, at Calle Charles Dickens 6 8 Investment: 1166319
- Care home, extension, at Avenida Hernan Nuñez de Toledo 3 New No news since December 2022
- 264 homes at Avenida Maria Victoria Atencia 27 29 Licence granted · start not confirmed
- Building with 24 homes near Calle Jose Garijo 8 Developer: not stated
- Building with 24 homes near Calle Jose Garijo 8 Investment: not stated
- Sector Universidad · 1,006 protected rental homes Homes: 1006
- Sector Universidad · 1,006 protected rental homes New Under construction
- Tren Litoral · coastal railway (Nerja Málaga Algeciras) New Announced, not confirmed
- Torre Málaga Wagen · 16-floor homes & aparthotel Developer: Zertum
- Torre Málaga Wagen · 16-floor homes & aparthotel Homes: 95
- Torre del Puerto · 144 m luxury hotel tower Developer: Andalusian Hospitality II, Al Alfia
- La Térmica · seafront homes, hotel and offices Homes: 500
- La Térmica · seafront homes, hotel and offices Developer: GINKGO Advisor y AEDAS Homes, Naiz Homes desde mayo de 2026, parcela del hotel
- La Térmica · seafront homes, hotel and offices Developer: GINKGO Advisor, AEDAS Homes, Naiz Homes, hotel plot
- La Térmica · seafront homes, hotel and offices Developer: GINKGO Advisor, AEDAS Homes, Naiz Homes
- Rojas–Santa Tecla · Churriana sector Announced, not confirmed
- Rojas–Santa Tecla · Churriana sector In process
- Rojas–Santa Tecla · Churriana sector New In process
- Torres de Repsol · residential towers (BIG, Toyo Ito, Morph) Developer: Urbania
- Torres de Repsol · residential towers (BIG, Toyo Ito, Morph) Homes: 528
- Torres de Repsol · residential towers (BIG, Toyo Ito, Morph) No news since 2022
- Old Portillo bus depot · 60 protected homes Homes: 60
- Plan Málaga Litoral · traffic tunnel under Heredia and Paseo de los Curas No news since July 2024
- Plan Málaga Litoral · traffic tunnel under Heredia and Paseo de los Curas Investment: not stated
- Muelle Heredia · waterfront office complex (Muelle 4) New Announced, not confirmed
- MUCAC Mayoristas · old wholesale market repairs Under construction
- MUCAC Mayoristas · old wholesale market repairs Investment: 940492
- Sector Morales · 430 homes and green space Developer: Culmina
- Sector Morales · 430 homes and green space Homes: 430
- Sector Morales · 430 homes and green space Investment: 20434967
- Metro · new line to the PTA / Campanillas (candidate) New Announced, not confirmed
- Metro · new line to El Palo / Rincón (candidate) New Announced, not confirmed
- Metro · new line to Ciudad Jardín (candidate) New Announced, not confirmed
- Metro Line 2 extension · Guadalmedina Hospital Civil Investment: not stated
- Martiricos · park sports area and protected-housing plot Homes: 200
- Marina de San Andrés · luxury marina (500–600 berths) Developer: Marina Málaga SAN, Al Alfia
- Marina de San Andrés · luxury marina (500–600 berths) Approved
- Los Guindos III · new homes (Vía Ágora 'Koa') Developer: Vía Ágora
- Los Guindos III · new homes (Vía Ágora 'Koa') In process
- Los Guindos III · new homes (Vía Ágora 'Koa') Homes: 250
- Los Guindos III · new homes (Vía Ágora 'Koa') Investment: 1539455
- Calle Hilera · extra floors for two hotels (Ibis Budget, Novotel) Developer: Anta Res Soli Iei
- Calle Hilera · extra floors for two hotels (Ibis Budget, Novotel) No news since November 2024
- EMASA · Guadalmar sewer network overhaul Under construction
- EMASA · Guadalmar sewer network overhaul Tender: 4432242
- EMASA · Guadalmar sewer network overhaul Investment: not stated
- El Bulto · Zaha Hadid 23-floor tower (sector Ferrocarril del Puerto) Developer: Sierra Blanca Estates
- El Bulto · Zaha Hadid 23-floor tower (sector Ferrocarril del Puerto) Homes: 233
- Distrito Zeta · Sánchez Blanca Homes: 3443
- New El Palo health centre and specialist centre (CARE) Starting soon
- New El Palo health centre and specialist centre (CARE) No news since December 2024
- New CEIP Intelhorce primary school Under construction
- New CEIP Intelhorce primary school Investment: 6700000
- Athletes' residence · Ciudad Deportiva de Carranque No news since March 2025
- Parque del Campamento Benítez No news since February 2024
- New underground bus station · Explanada de la Estación No news since July 2024
- Sector Buenavista · 1,362 protected homes Developer: Casa 47
- Sector Buenavista · 1,362 protected homes Homes: 1362
- Sector Buenavista · 1,362 protected homes Investment: 33590759
- Málaga CF training ground · El Arraijanal phase 2 PEM: 9746100
- Paseo Marítimo Antonio Banderas · extension to Sacaba No news since February 2025
- Paseo Marítimo Antonio Banderas · extension to Sacaba Developer: AEDAS Homes
- Paseo Marítimo Antonio Banderas · extension to Sacaba Developer: GINKGO Advisor y AEDAS Homes
- Building works on Avenida Alicia de Larrocha 1 Starting soon
- Building works on Avenida Alicia de Larrocha 1 New Starting soon
- Crane or lifting on Calle Francisco López López 48 Starting soon
- Crane or lifting on Calle Francisco López López 48 New Starting soon
- Facade works on Plaza Ejido 5 Starting soon
- Facade works on Plaza Ejido 5 New Starting soon
- Crane or lifting on Calle Miguel de Mérida Nicolich 1 Starting soon
- Crane or lifting on Calle Miguel de Mérida Nicolich 1 New Starting soon
- Water and sewer works on Avenida de San Javier 1 Starting soon
- Building works on Calle Alcalde Eugenio Entrambasaguas 18 Starting soon
- Building works on Calle Alcalde Eugenio Entrambasaguas 18 Starting soon
- Removal on Calle Nuestra Señora de las Candelas 25 Starting soon
- Building works on Calle Jordán Marbella 25 Starting soon
- Crane or lifting on Calle Gaona 3 Developer: Venerable Archicofradia del Santisimo Cristo de la Sangre, otros
- Facade works on Calle Frailes 36 Starting soon
- Other planning notice: Adopción de Un Acuerdo Municipal para la Aplicación de las Medidas Previstas en el Decreto-LEY 1/2025, de 24 de Febrero, de Medidas Urgentes en Materia de Vivienda, con el Fin de Incentivar el Cambio de uso en parcelas de suelo Urbanizado para Destinarlo a la construcción de viviendas Protegidas Developer: Fundación Bancaria Unicaja, otros
- Partial plan: Plan parcial de ordenación el Higueral PGOU 2011 In process
- City plan amendment (PGOU): Modificación de la Normativa del PGOU Disposición Adicional 3ª para Limitar viviendas de uso Turístico (Vut) en Zonas Saturadas. ) Approved
- Detailed study (Estudio de detalle): SUNC-R-T.1 Cortijo Merino Manzanas R-7; R-8; R-9 y R-10 Developer: Fundación Vimpyca, otros
- Detailed study (Estudio de detalle): Modificación del estudio de detalle relativo a la parcela Industrial Específico-3 del plan parcial SUPT.9 Trévenez PA-T.6 In process
- Special plan at Carretera Azucarera-intelhorce 134 Approved
- Detailed study (Estudio de detalle): Defnitiva del estudio de detalle de parcela R-6 del PA-G.11 plan de Sectorización del sector Sánchez Blanca Developer: Fundación Vimpyca, otros
- City plan amendment (PGOU): Modificación de elementos pormenorizada 36 Developer: Doc Málaga Siteco S.L. y Doc Málaga Sitecto Phase 2 S.L., otros
- City plan amendment (PGOU) at Calle Compas de la Victoria 5 Developer: De Oficio a instancia de CPS Integración de Recursos S.L.
- City plan amendment (PGOU): Modificación de elementos pormenorizada 38 del PGOU. nueva delimitación y uso del Calle Pepita Barrientos Developer: De Oficio a instancia de Grúas Raimundo S.L.U.
- Other planning notice: Instrucción 2025/01, de la Gerencia Municipal de Urbanismo, obras e Infraestructuras, sobre delimitación de Actuaciones de Mejora Urbana (Amu) en el suelo urbano del Vigente PGOU de Málaga New No news since February 2025
- Other planning notice: Inicitativa privada y Sometimiento a Consulta Pública del Avance de Un estudio de ordenación en el ámbito del Arroyo Pilones Approved
- Other planning notice at Calle Diaz Camacho 10 In process
- Other planning notice: Documento Actualización de Zonificación Acústica de la Ciudad de Málaga No news since April 2025
- Other planning notice: Documento Actualización de Zonificación Acústica de la Ciudad de Málaga New No news since April 2025
- Water and sewer works on Calle Obispo Juan de Lancaste 3 New Under construction
- Water and sewer works on Avenida de San Javier 1 New Starting soon
- Building works on Calle Alcalde Eugenio Entrambasaguas 18 New Starting soon
- Water and sewer works on Calle Escritor Luis José Castro 15 New Under construction
- Water and sewer works on Calle Diego de Vergara 32 New Under construction
- Facade works on Calle Mariscal 2 New Under construction
- Crane or lifting on Paseo Miramar 7 New Under construction
- Facade works on Calle Gabriel Miró 1 New Under construction