Detailed study (Estudio de detalle)
Detailed study (Estudio de detalle): Modificación del estudio de detalle relativo a la parcela Industrial Específico-3 del plan parcial SUPT.9 Trévenez PA-T.6
Detailed study (Estudio de detalle): Modificación del estudio de detalle relativo a la parcela Industrial Específico-3 del plan parcial SUPT.9 “Trévenez” PA-T.6(97)
- Developer
- Gafitocuoil S.L.
- Public body
- Ayuntamiento de Málaga
- File no.
- PL 39/2023
Record updated: 30 Oct 2025. Data from official sources.
Initial approval on 30 October 2025
Terms: Detailed study (Estudio de detalle)Detailed study (Estudio de detalle). Planning document that fine-tunes one plot or block: building lines, levels and how volumes are arranged. It does not change the use or add floor area, and it does not authorise works: a licence is still needed. Partial plan (Plan parcial)Partial plan (Plan parcial). Plan that lays out a new development sector in detail: streets, plots, green areas and facilities. Reparcelling, urbanisation works and licences come after it.
This project is not drawn on the map because the source gives no exact location.
Sets building volumes, alignments and levels for one plot or block. Stage: initial approval on 30 October 2025. Applicant: Gafitocuoil S.L. File PL 39/2023. This is not a building licence: a licence is still needed to build.
Can I object?
We do not know whether the period is still open: the notice does not publish its dates. Initial approval was on 30 Oct 2025. Check the official notice or the BOP.
This document has initial approval. After it there is a public consultation period: anyone can file objections or proposals (alegaciones) at the council registry or through its online office (sede electrónica). The exact period and its start date appear in the official notice, usually in the BOP (Málaga provincial gazette). Check them before filing anything.
Timeline
- Initial approval · source
Change history
- Status: from “Approved” to “In process”
Sources
- City planning office (Gerencia Municipal de Urbanismo) · notice: «Aprobación Definitiva de la Modificación del Estudio de Detalle relativo a la Parcela Industrial Específico-3 del Plan Parcial SUPT.9 “Tréve»
- File document: Informe Tecnico AI PL30 24 (PDF)
- File document: Acuerdo JGL AI PL30 24 (PDF)
- File document: Documentacion Tecnica AI PL30 24 (PDF)