Public space
Starting soon
Calle Ollerías · full street regeneration
- Public body
- Ayuntamiento de Málaga
- Budget
- €2.27M
Record updated: 5 Aug 2026. Data from official sources.
Tendered on 5 August 2026 (bids until 25 August); we found no award or start date
Hand-reviewed major project. The timeline summarises public sources; the link is the latest source checked.
Integral regeneration of Calle Ollerías and Plaza Pepe Mena: new water and sewer networks and drainage, new paving, 28 benches, 38 trees and palms, about thirty LED street lights and wider pavements (removing surface parking near Cruz del Molinillo), keeping one traffic lane. It links the Mercado de Salamanca and El Molinillo with the historic centre. Part of the Conecta_Málaga plan, co-funded by the EU's ERDF (FEDER) 2021-2027 programme.
Timeline
- The Conecta_Málaga plan includes the renewal of Calle Ollerías · source
- Works put out to tender (€2,274,234.22 incl. VAT, 10 months; bids until 25 August) · source
Change history
- Tender: from “€2.27M” to “€2.27M”